Construction Surveying

BFM's construction surveying services are generally done in stages and are somewhat treated as separate stages from the initial boundary survey with all corners set with iron rods, construction benchmark set to the proper grade (FEMA), location of improvements (forms before pouring concrete to insure proper grade and location to property line generally this is needed to get permit from the parish. Once concrete is poured then we confirm location and elevation than the slab certification is issued to FEMA requirements. Then once the flatwork is in (driveway, patio, sidewalks) it is located on the plan then the final plan and flood certificate is issued and the project is complete.